Luckily, the Quezon City government has their own decent website which contains the forms and we just downloaded them. It made life easier because we didn't have to go to the cityhall in person which is quite a hassle.
We started preparing for this building permit around three weeks ago. I've downloaded all the forms from http://www.quezoncity.gov.ph/ and asked Engineer to draft and prepare the plans. There are basically 4 sets of plans that needed to be prepared -- Architectural, Structural, Electrial and Plumbing. Each plan will be prepared by a specific professional person in my team.
Architectural Plans
- Vicinity map/Location Plan
- Site Development Plan
- Perspective
- Floor Plans
- Elevations (at least 4)
- Sections (at least two)
- Reflected Ceiling plan
- Architectural details: e.g. stair, fire escape, cabinets, partions, etc.
- Schedule of doors & windows
- Schedule of finishes
- Details of major architectural elements
Civil/Structural Plans
- Foundation Plan and details
- Floor/Roof framing plan and details
- details and schedules of structural work
Electrical Plans
- Location & site plans
- legend & symbols
- Gen. notes
- Electrical Layout
- Schedule of loads
- single line diagram
Plumbing/Sanitary Plans
- Location & site plan
- Plumbing plans, layouts and details
- legend & general notes
- Isometric of the system
- technical specs
No comments:
Post a Comment